Tule Wind Energy Project
CACA-49698
Variance Requests
Variance
Request |
Variance Request Submitted |
Variance
Issued |
Location |
Description |
001 |
October 26, 2012 |
November 2, 2012 |
Geotechnical Activities |
Use of one Type II Water Tender and one Type III Engine in-lieu of a Type VI Skid Mount pump unit. |
002 |
May 16, 2013 |
May 20, 2013 |
Geotechnical Activities |
Variance 002 includes the following activities; use of additional existing roads, use of a track-mounted excavator, ability to shift small to medium sized boulders and use of a chain-saw or similar type equipment to trim vegetation |
003 |
December 20, 2016 |
February 14, 2017 |
A-string, F-string, and G-string |
Realignment of access roads along the A-string,
F-string, and G-string to minimize disturbance to
previously undisturbed areas, to avoid impacts to
sensitive environmental resources, and to accommodate
construction and engineering design. |
004 |
January 9, 2017 |
N/A |
G-string |
Addition of seven areas outside of the previously approved limits of disturbance to allow for the relocation of boulders along the G-string for project constructability.
This variance request has been combined with 006. |
005 |
February 9, 2017 |
February 23, 2017 |
Temporary Laydown Yards 9 and 11 |
The use of generators to provide power for up to four Conex storage trailers including:
• Two Conex trailers and one generator within the 2-acre laydown yard (Yard 9) off of McCain Valley Road.
• Two Conex trailers and one generator within the 2-acre laydown yard (Yard 11) located off the H-string access road.
|
006 |
March 24, 2017 |
April 24, 2017 |
Project Wide |
Allows for Tule Wind LLC and the BLM field team to approve, on a case-by-case basis, specific project-related activities within a 20-foot-buffer outside the limits of disturbance approved in the 2016 Plan of Development.
|
007 |
March 3, 2017 |
April 14, 2017 |
Project Access Roads |
Addition of small impact areas for the installation of riprap associated with 48 culverts along project access roads.
|
008 |
March 24, 2017 |
April 18, 2017 |
2-Acre Laydown Yard (Laydown Yard 6) |
Addition of a concrete batch plant facility in an existing 2-acre laydown yard. |
009 |
March 28, 2017 |
May 16, 2017 |
Project Wide |
Includes additional temporary areas needed for turbine installation for blade overhang areas, Nacelle tagline areas, and turbine top section staging areas.
|
010 |
March 29, 2017 |
June 14, 2017 |
McCain Valley Road |
Includes additional areas needed for constructability and safety associated with travel along McCain Valley Road near the Lark Canyon Campground and off-highway vehicle (OHV) staging area.
|
011 |
April 7, 2017 |
April 24, 2017 |
Laydown Yards 9 and 11 |
Relocation of office trailers from San Diego County land to laydown yards 9 and 11.
|
012 |
April 20, 2017 |
May 24, 2017 |
McCain Valley Road |
Includes widening portions of McCain Valley Road at three specific areas for constructability and safety during construction.
|
013 |
Revised June 13, 2017 |
June 21, 2017 |
Overhead Collection Line |
Includes adjustments to the overhead collector line pole locations, associated access roads, and construction areas to reduce impacts to recently identified environmentally sensitive areas.
|
014 |
Revised July 3, 2017 |
July 27, 2017 |
Project Wide |
Includes additional pull areas for wire pulling along the transmission and collector lines, the use and widening of an existing access road, and shifting of a transmission line structure.
|
015 |
June 16, 2017 |
July 12, 2017 |
Turbine B-5 |
Requests turbine B-5 to be approved as an alternate turbine that would replace an approved turbine, should it be determined necessary.
|
016 |
July 7, 2017 |
July 12, 2017 |
McCain Valley Road |
Requests a change in the means for installing underground collector line under McCain Valley Road from boring to trenching. |
017 |
Submitted
June 25, 2018;
Revised
August 24, 2018
|
September 7, 2018 |
Project Wide |
Requested to rectify the difference in road widths between the Project plans and widths observed on the ground. |
018 |
February 24, 2020
|
April 8, 2020 |
McCain Valley Road |
Requested extending the work area beyond the previously approved limits of disturbance to implement erosion control improvements. |
This website is being hosted by Dudek and is not an official BLM website. This page contains tables and is best viewed with Netscape or Internet Explorer. Please report any problems to the web coordinator.
|
|
CONTACT INFORMATION
Compliance Monitors
800-735-0848
tulewindeccmp@dudek.com
(10MB attachment limit)
BLM El Centro Field Office
1661 S. 4th Street
El Centro, CA 92243
Carrie Sahagun Assistant Field Manager for
Resources and Planning
Phone: 760-337-4437
Email: csahagun@blm.gov
Tule Wind LLC
855-369-9937
windcommunity@avangrid.com
PDFs on this site require Adobe Acrobat Reader. It may be downloaded for free here.
This site is managed by Dudek, the environmental compliance monitor.
|